From: route@monster.com
Sent: Friday, April 29, 2016 3:30 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Kevin Martin, CFCE 4943 Park Rd. Charlotte NC 28209, Contact: (770) 283-0174 kevin.martin365@gmail.com
Objective: Seeking to
position professional technical services in the Advanced Optical Networking
market. Involving, Multi-Technology, Multi-Vendor networks or Single OEM
solution. Which could involve a variety of deployment types including: Metro,
Local, Campus, Statewide, Regional, PON (private optical networks) or
nationwide. Roles can include: Project Management, Project Engineering,
Network Integration and or supervision of installation, testing, upgrades and
preventative maintenance on all optical networks with CWDM/DWDM/ROADM, Packet
Optical, Carrier Ethernet, Multi-Service SONET and OSP technologies. This
could include but is not limited to Fiber Characterization
Engineering/Testing, transmission/transport, switching and routing systems,
as well as, digital cross connect equipment and peripheral network equipment
and it’s associated cabling. I am also interested in a strong technical work
force that promotes technical self-study and certification training that will
increase my skill-set in this rapidly growing industry. EDUCATION:
DeVry Institute of Technology, B.S. 1993- Present (On-line)
Major: Technical Management
Minor: Business Operations Naval Aviation
Technical Training Center, 1988-89 Weapons Technician/Administrative
Services, 4 years, U.S. Navy, Honorably Discharged GENERAL BACKGROUND
Current
Training:
CISCO OMSTP1 - Cisco ONS 15454 MSTP from Installation to Protection
REL 9.6 DWDM Optical (4/2013)
CISCO OMSTP2 - Cisco ONS 15454 Multiservice Transport Platform (MSTP)
Advanced Topics and Data v9.6 – Optical (6/2013)
JDSU/OTT TT-CFCE – Certified Fiber Characterization Engineer (5/2013)
Infinera Certification - R6.0 DTN Turn Up and Test (6/2011) PMI Member, PMP Test
Candidate, 2014 Full study of PMI’s (Project Management Institute)
PMBOK 5th edition (Project Management Book of
Knowledge), Multiple PM Professional Development Courses/Earned PDUs
Four+ years
professional sales - Twenty+ years technical troubleshooting experience
utilizing extensive customer relations and problem solving skills with a
committed sense of urgency.
Experienced & proficient in: Review of network as-built,
topology and constraints for network upgrade and overbuild planning, Network
Audits to reconcile facility records and identify hardware for
decommissioning and or de-installation, OEM solution analysis, Systems
Engineering, Detail Engineering and engineering validation, comprehensive and
detailed Site Surveys, (EDP) engineering design package creation, drafting
(DSOW) Detail Scopes of Work and project (WBS)work breakdown schedules,
drafting detailed (MOPs) method-of-procedures for hardware installations,
circuit integrations or maintenance window network operations, Rack and Stack
for pre-installation chassis provisioning, multi-vendor turn-up, test and
system integration, skill delivery methods for technical trainer (train-the
trainer candidate), Fiber Characterization Testing: connector end face
inspection, insertion loss measurements, return loss measurements, OTDR
testing, chromatic dispersion testing, polarization mode dispersion testing
and spectral attenuation analysis, Documenting results in approved file
format, Engineering Analysis and interpretation of results. All projects will
adhere to customer operations protocol, SOW and the guidelines set forth by
the Recommendation ITU-T G.650.3 - Test methods for single-mode optical Fiber
links following
ITU-T G-Series
Recommendations: ITU-T
G.650 - ITU-T G.659 - Characteristics of Optical Fiber Cable
ITU-T
G.660 - ITU-T G.679 - Characteristics of Optical Components and Subsystems
ITU-T
G.680 - ITU-T G.699 - Characteristics of Optical Systems
WORK
HISTORY:
CEO/Founder/Optical Network Engineer
IBOK-Managed Technical Services L.L.C.
2012-2014
Responsibilities:
Sell and perform Advanced Optical
Networking Services for Telecom Carriers, Utilities, PON (Private Optical
Networks), State and Local Governments. Signed Strategic MSA’s as a
Network Engineering Services Vendor and tactical operations planning for 10
Certified Technical Deployment Engineers for which 5 are Field Project
Managers. Arranged and attended certified OEM and FC training for all
technical staff. Services included:
Respond to Advanced Optical Broadband and Access network latency build plans
RFQ/RFP with a firm price or T&E quote, create a new project order post
award, which included procurement of additional installation related
materials, scheduling project meetings and technical resources via corporate
procurement and scheduling tools, track progress of project order through
installation, circuit provisioning, network traffic activation and close
project
(Affective 9/2012 to present, network operations vendor as IBOK-Managed
Technical Services L.L.C.) Transport Engineer
Windstream Communications, Transport Engineering S.E.
2/2012
Responsibilities:
Respond to Network Planner and
staff Sr. Engineer plans to expand existing network. This position included:
drafting of the RFQ, outlining scope agreement for approval process and
equipment/materials procurement. Providing MS Visio drawing of network
schematic. Entering work order details into JobTrac, PINCS, Ariba, SIS, MTS and
JD Edwards applications. Follow project through life cycle and close upon
completion.
*Sponsored by Transport Engineering Management and Sr. Dept. Engineer to
become a fully insured Tier 2 vendor for Professional Transport Engineering,
Fiber Characterization Testing/Engineering and EFI&T Services (Affective 6/2012
to 9/12, in-house transport engineering as IBOK-Managed Technical Services L.L.C.) Windstream Communications per Master Contractor
Agreement for Network Services (#120608W1) Senior Project
Manager/Engineering
Ledcor Technical Services, EF&I Deployment 2011
Responsibilities:
Respond to full turn-key RFQ with
firm bid, evaluate/define scope of work, perform kick-off meeting, initiate
project tracker, and create project work-folder. Resource project team,
assign PM for single point of contact for all project logistics, schedules
and technical issues. Maintain LTS EF&IT out of scope process (a method
for capturing extra work performed outside of the original SOW, during the
project and submitting for adjustment to the original bid price)
Project
Manager/Engineering
Ledcor Technical Services, EF&I Deployment
Responsibilities:
Single point of contact for all project logistics,
schedules and technical issues. Reviewing all incoming customer engineering,
reviewing all LTS engineering packages for quality prior to installation.
Evaluation of project materials procurement prior to purchasing. Arrange
materials logistics and staging Arrange site survey, installation and closing
team site access.
Senior Detail
Engineer Ledcor Technical
Services, EF&I Deployment
2010-Present
Responsibilities:
Perform site surveys for new
builds, collect customer information, and create Visio drawings of floor
layout, rack elevation, circuit and schematic drawings. Also responsible for
OEM and vendor relations, build bill of materials. Turn-up and commission new
builds of Infinera DTC and OTC transport equipment. Responsible for delivery
of completed EDP (Engineering Documentation Package) and
AS-Built final documentation, Installation Quality Checklist and Photos. Network Deployment
Engineer, Google/ Arris Professional Services NetDeploy
U.S. East / Google Europe Team 2009-Present
Responsibilities:
Installation, Turn up,
Commissioning of 1.6 Terabit network DWDM ROADM transport equipment using
Raman amplifiers and multi-degree configurations. Fiber testing and Circuit
migration, Lead a two man team responsible for decommissioning and de-installation
of inactive network equipment. Assigned to Google European team, traveled to
Europe to stage, install, turn-up and commission transport routes. Optical Test
Engineer, Cisco, Telamon Corp, Tek Systems
Time Warner Account / Systems Integration Team
2009-2010
Responsibilities:
Los Angeles Market included- Turn
up, Testing and Circuit Integration of Cisco ONS 15454 Rel. 8.53 metro DWDM
ROADM network, of three separate network configurations (2 fiber ring [15
nodes], DWDM Mesh using wavelengths as mesh fabric and a separate DWDM Mesh
network using 40-WXC-C wavelength cross-connect cards and 4 degree optical
patch panels, task also included long and short OTDR shoots and DCU reconfiguration
during network equalization phase. All channels and network equipment tested
for 24 hours. Project was successful and delivered on schedule.
Sr. Field Engineer,
via Tek System, Light River Technologies
National LambdaRail / Systems Integration Team
2008-2009
Responsibilities:
Nationwide Project included- Turn
up, Circuit Testing and Circuit Integration of Long Haul DWDM transport nodes
of three separate networks, task also included long and short OTDR shoots to
verify span loss data and improve existing network light values through fiber
plant inspections. Warehouse Site Staging/Pre-configuration, NLR-
National DWDM point to point network w/114 Cisco ONS 15454 MSTP nodes
(Rel.9.0), consisting of Terminal, ROADM (Using- Raman amplifiers) and OLA
configurations, collocated nationally in Level 3 facilities, Warehouse
Site Staging/Pre-configuration. Windstream Communications
- Cisco ONS 15454 MSTP/ 11 node DWDM 2 fiber ring network. M
& A Power Co. / Central Office- Installation of telecom
Head-end, included various types of transport and channel service equipment
(13) Fujitsu 4500’s. Pictures available Lead Field Technician
Level 4, via Alta Telecom
NEC Corporation of America NE Region / Installation Support Team
2007-2008
AT&T Account
Responsibilities: Installation of various SONET, DWDM,
Routing and Switching Systems Installation of riser fiber plant (network
growth orders) Lead Field Engineer
HS-1, Nortel Networks via Ajilon Communications
Wireless CDMA/EVDO Deployment SE Region / Network Integration Team
2006-2007
Sprint/Nextel Account
Responsibilities:
CDMA Metro Cell Installation,
Hardware and Software upgrades, Power up, File creation and downloading with
Vortex 13.x, EVDO DOM installation and configuration Lead Field Engineer,
Cingular
Wireless
via Goodman Networks contract
Georgia PSAP Deployment / E911 Installation/Maintenance Team
2005-2006
Responsibilities:
Installation, Commissioning, Dual
Banding/software upgrading and Maintenance of the True Position LMU (Location
Measurement Unit) 850/1900 MHz wireless location systems
and the Ericsson RBS 2106, 2206 In the Georgia and Georgia Coastal PSAP’s (Public
Service Answer Point) Network Tester,
Nortel
Networks
via Tek Systems contract
Broadband Networks Group / Optical Network Team 2004-2005
Responsibilities:
Installation, Turn-up, light level
Equalization and Testing of Nortel’s metro line of optical / DWDM equipment
and peripheral hardware. Including: Nortel’s Metro line and Common Phonic
Layer. 100% nation wide
travel Project Manager,
SLBD Telecommunications Inc.
2004
Responsibilities: Assisted in new
business opportunities by attending Bidders Conferences for Division 16
(telecom projects), Obtain Project RFP, Perform Take-Offs and cost
projections from project drawings, Attended numerous Trade Shows (SuperComm,
Net World Interop, Comdex, ect.) to obtain operational/Interoperability
specifications as part of my solutions provider job responsibilities. Advise
in OEM vendor selection process. As well as project methodology selection
process. MOP (method of procedure) document preparation. Assembly of
engineering documentation packages, which included: Site Maps,
Installation Notes, Equipment List, Bay/Shelf Drawing, Cable Run List,
Commission/Provisioning Info and Test Data Sheets, along with creating any
additional documentation required by the Customer.
Project Manager,
Fiberqwest Telecommunications Inc.
Network Systems Engineering/Installation Team
2001-2004
Responsibilities:
Managed a diverse range of
telecommunication installation projects. Including but not limit to:
Enterprise/ Carrier Class network installations (C3 communications,
Qwest Link), Structured Cabling/LAN Component Installations (Belzoni
Mississippi, City School System, Rome, Georgia City School System) Outside
Plant / Underground Construction Cable and Pedestal Installation. All
projects required utilizing various installation and cable placement
methodologies specific to its application. Responsible for coordinating
inventory shipment and logistics issues, site access with site/route
technicians and regional managers.
Transport Systems
Engineer, 360 Networks Inc.
Network Systems Engineering Group, Southeast Team
2000-
2001
Responsibilities:
Design, engineer and schedule installation of transport and its peripheral
equipment within a SONET backbone. Work directly with transport equipment
vendors on E, F and I basis. Evaluate and approve engineering data packages
(EDP’s) for system installation, test and turn-up. Manage vendors,
procurement / logistic services. Coordinate Transport equipment
(cross-connects/circuit breaker assignments) with DC power and Access
equipment. Senior SLAT
Technician, Nortel Networks
Broadband networks group/ Network Ring Reconfiguration
Team 1998- 2000
Responsibilities:
Senior Tester for the nation wide Ring Reconfiguration Project for Qwest
Communications. Included, 97% travel to all Qwest sites being converted from
linear configurations to ring configurations. Coordinating all inventory
shipments, site access with site/route technicians and regional managers,
lighting systems after 24 hour bit error ratio test and assisting in the
network optimization and integration of live data traffic. As well as,
troubleshooting and repairing and/or replacing all malfunctioning network circuitry.
Site Team Leader /
Installer, Nortel
Networks
via Comforce Contract Broadband Networks
1998 Responsibilities: Preparing area for bay
installation, securing bay framework, connecting bay frame ground to office
ground, connecting office battery to the OC192 bay, installing circuit packs
and office cabling to the SATT (synchronization, alarms and telemetry
terminations), installing DWDM filter module assembly, installing and routing
fiber cabling and STS coaxial on OC192 bays, cleaning optical connectors,
running and preparing OC48 BNC cabling for termination, loop back testing,
prepare system for testing and customer turnover.
Network Operations
Specialist Sprint via H.L.
Yoh
Contract
Sprint Private Line Service Center
1997-98 Responsibilities: Includes interpreting
received data from (ACE) automated circuit evaluation system, installing and
maintaining circuits at the DS0, DS1, DS3 levels, mapping circuits via the
(DCCS) digital cross connect system, monitoring performance of data traffic
and equipment on the circuit, perform corrective maintenance on ports
(remotely), interface with customer on maintenance, provisioning and
troubleshooting issues and maintain detailed entries in Sprint’s (TRS)
Trouble Reporting System. Staging/Installation
Technician, Motorola Inc. via Aerotec Contract Land
Mobile Products Sector 1996-97 Responsibilities: Provide
pre-manufacturing of the CENTRLINK 911 PBX SWITCHING SYSTEM. Includes:
mounting switching cabinet, 66 trunk blocks, telco interface blocks, SRX
processor card RD-232c/alarm breakout maintenance box, ring generators,
configure and install interface cards, cabling and termination, program
processor with default database, commission peripheral P.C. with 911 software
in UNIX and internal mapping and programming of system telephones.
Establish communication between system and local telco interface, test
entire system for field proficiency. Weapons Technician United
States Navy, U.S.S. Constellation 1988-1992 Responsibilities: Service and maintain
missile systems and control components for the F-14 Tomcat, FA-18 Hornet and
EA-6 Intruder Fighter/Attack aircraft, including stray voltage checks, line
testing, RF system testing of missile ejection systems and laser guided
targeting systems. COLLATERAL COURSES:
PMI (Project Management Institute)
Project Management Essentials and PMP prep via Villanova
University, PMI Course (2009602) PM Simulation Workshop, Computer Information
Systems, Advanced Fault Analysis, Field Inventory Management, Advanced
Customer Relations, Microsoft Office 2010, Visio 2010, Infinera R6.0
DTNOTN PON Turn Up and Test Certification 2011, Manual Study of R7.0
DTN-X, Infinera ATN Digital Optical Network for Metro Access Networks and
Infinera Management Suite (IMS), DeVry Telecommunications Management
coursework. COMPREHENSIVE SELF
STUDIES:
Central Office/Network Environment Equipment Installation/Removal
Generic Requirements GR-1275CORE, Central Office/Network
Environment Detail Engineering Generic Requirements GR-1502-Core, Quality
Program Analysis (QPA) for Telecommunications Engineering or Installation
Service Providers GR-2981-CORE, CCNA Self-Study Certification
Library (ICND 640-811 and INTRO 640-821), Cisco ONS 15454
MSPP/MSTP, BICSI Member, 2006 Full study of BICSI’s Telecommunications
Distribution Methods Manual 9th edition, BICSI (Building Industry Consulting
Service International) RCDD (Registered Communications Distribution
Designer) Test Candidate. Cisco, 2007 Full study of CCNA
certification, (ICND 640-811 and INTRO 640-821) BICSI,
Telecommunication Cabling Installation Manual, Customer-Owned Outside Plant
Design Manual, Residential Network Cabling Manual, LAN and Internetworking
Design Manual, Wi-Fi/ Wi- Max technology- IEEE 802.11/16 standard and
variations in the free spectrum, AutoCAD. PMI Global member ***
References and photo portfolio available upon request *** |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|